Campus Maintenance Facility

Project Size: 69,000 SF
Project Cost: $424,650.00

Roof System

  • Complete removal of two roof systems down to the steel deck.
  • 4.4” of isocyanurate rigid roof insulation (R-25), mechanically fastened.
  • A GAF 60 mil TPO mechanically fastened membrane.
  • 1,000 LF of walk pad and 1,200 LF of welded yellow warning lines were also installed.

Warranty

The project included a 20-year Manufacturer’s warranty covering materials and labor, as well as 2-year Contractor’s workmanship warranty from McCurdy-Walden.

The University of North Florida CMF (Bldg #64) required complete removal of two roof systems down to the steel deck. Next, 4.4” of insulation (R-Value 25) was mechanically attached to the steel deck and a GAF 60 mil TPO was mechanically fastened and heat welded seams. The project also included over 1,000 LF of walk pad and 1,200 LF of yellow perimeter warning lines. The project included a 20-year warranty.