San Marco East
Project Details
(Formally Metro Square Office Park)
Project Size: 421,000 SF
Project Cost: $2,391,975.00
Roof System
- Complete removal of the existing modified bitumen roof system down to the gypsum deck.
- Installation of a Carlisle 115 mil fleece back TPO adhered in Fast-100 low rise foam adhesive.
- The 97,500 SF ice rink & sports complex building had a metal roof system that was restored and sealed with 2 coats of ER Systems, Acrylic 1000.
Project Challenges
San Marco East was the largest roof replacement project in North Florida in the last 3 years. The main challenge of this project was the replacement of deteriorated gypsum decking. Over 870 gypsum panels had to be removed and replaced before the new roof system could be installed. The 421,000 SF property was broken into 8 separate buildings most with high parapets walls making them difficult to load and flash.
Warranty
The project included a 20-year Manufacturer’s warranty covering materials and labor, as well as 2-year Contractor’s workmanship warranty from McCurdy-Walden.
Gallery