Bayview Elementary
Project Details
Project Size: 51,500 SF
Project Cost: $245,850.00
Roof System
Carlisle 115 mil fleece back TPO adhered in Fast-100 low rise foam adhesive directly over the existing modified bitumen cap sheet.
Project Challenges
The new Carlisle TPO roof system had to be installed while the students were in session. Very limited access, multiple roof levels and hundreds of elementary students in and out of classrooms made this project extremely challenging.
Warranty
The project included a 20-year Manufacturer’s warranty covering materials and labor, as well as 2-year Contractor’s workmanship warranty from McCurdy-Walden.